Bathroom renovation cost in Toronto (2026)
A typical 110 sqft bathroom lands between $10,000 and $16,000 on our public rate card — smaller projects start near $6,000, big ones reach $28,000+. And unlike every cost guide on this page of Google, these numbers aren't estimates from last year: they render from the same live RATE CARD V5 the crews are paid on, today.

What it actually costs
TYPICAL PRICE — 110 SQFT BATHROOM · LIVE FROM RATE CARD V5 — UPDATED JULY 2026Those are typical mid-size projects. Your number moves with square footage and the answers you give — smaller rooms genuinely price smaller, and every add or reduction shows as its own line. The estimate is ±30% at step one and ±8% by the end, then one site check locks it. After that, changes only happen as written change orders you approve.
What moves the price
THIS IS THE LIVE BRIEF — TAP ANSWERS, WATCH YOUR ESTIMATE MOVEVerified crews, real jobs


How the price gets — and stays — honest
- 01Build a 2-minute briefAnswer what you know, skip what you don’t. The estimate reprices live with every answer.
- 02Lock it with 10%Refundable until the first crew accepts. Verified crews take your job cards within 24–48h.
- 03One site checkHidden conditions only — photographed and priced in writing before anything proceeds.
- 04Pay per passed milestoneCrews are paid when milestones pass YOUR approval. Final 5% after your walkthrough.

Bathroom renovation cost questions, answered straight
How much does a bathroom renovation cost in Toronto in 2026?
On our public rate card, a full bathroom renovation in Toronto runs $6,000–$28,000 depending on size, scope and spec. A powder room prices about 55% below a full bath; a master ensuite adds $4,500 for the extra footprint and fixtures. You can see your exact number in 2 minutes — no email, no sales visit.
What does the price include?
Demolition, disposal, plumbing and electrical work by licensed trades, waterproofing, tile, fixtures installation and paint — performed under your direct contract with the crew, with per-milestone payments released on your approval and a written change-order rule: no surprise costs, ever. Fixtures and tile are supplied at the tier you pick (Good/Better/Best), each priced on the page.
How long does a bathroom renovation take?
A standard full-gut bathroom takes 2–3 weeks on site. Powder rooms run about a week; ensuites with layout changes run 3–4 weeks. Crews start as soon as 2–3 weeks from deposit.
Do I need a permit for a bathroom renovation in Toronto?
Like-for-like renovations (same layout, no structural or major plumbing moves) typically don't need a permit. Moving walls or relocating the stack does. Your crew handles permit questions at the site check — before your price locks.
Why is your price lower than the quotes I got?
It isn't padded, it's structured: your contract and price are direct with the crew, who gets the full rate-card labour price and pays the platform a partner fee — you never pay a markup on top. And because the price comes from a published rate card, nobody is guessing at what you'll accept.
What if you find problems behind the walls?
Hidden conditions (rot, knob-and-tube, galvanized plumbing) are photographed, priced in writing, and approved by YOU before anything proceeds. The range you see already carries an allowance for the common ones in older Toronto homes.