MR.CONTRACTORSIGN IN

Bathroom renovation cost in Markham (2026)

A powder room in Markham starts around $3,360; a full main / family bath runs about $9,940 at builder grade — and every pick reprices live as you build the brief. And unlike every cost guide on this page of Google, these numbers aren't estimates from last year: they render from the same live Mr.C rate card the crews are paid on, today.

SEE MY EXACT PRICE — 2 MIN ↓NO EMAIL · NO SALES VISIT
Finished modern bathroom renovation in Toronto — freestanding tub, glass shower, CN Tower view

What it actually costs in Markham

STARTING PRICE BY ROOM · LIVE FROM THE MR.C RATE CARD — UPDATED AUGUST 2026
POWDER ROOM · 25 SQ FT
FROM$3,360
Half-bath — the quick win
MAIN / FAMILY BATH · 90 SQ FT
FROM$9,940
The everyday full renovation
MASTER ENSUITE · 150 SQ FT
FROM$15,360
Big spa-style ensuite

Those are builder-grade starting points — Better and premium tiers price up from there as you pick materials in the brief. Your number moves with square footage and the answers you give — smaller rooms genuinely price smaller, and every add or reduction shows as its own line. The estimate is ±30% at step one and ±8% by the end, then one site check locks it. After that, changes only happen as written change orders you approve.

RENOVATING IN MARKHAMMarkham splits between older Unionville stock and newer Cornell/Berczy builds. Newer homes mean predictable framing and plumbing — renovations land mid-range with fewer surprises; older Main Street properties get the hidden-condition allowance.

What moves the price

THIS IS THE LIVE BRIEF — TAP ANSWERS, WATCH YOUR ESTIMATE MOVE
STEP 3 OF 7 — DETAILS
The details
BATHROOMANSWERS MOVE THE ESTIMATE LIVE
FLOOR AREASQFT
rough is fine — the site check confirms it before your price locks
Which bathroom is it?
Powder roomMain / family bathMaster ensuite
What's actually in scope?
Full gutTile only — demo + installFixtures swap only
Moving walls or the doorway?
No — same footprintWall or door changes
ALSO INCLUDED?
PAINTING +$600
BOOSTERS — OPTIONAL
HEATED FLOOR +$2,200GLASS SHOWER PANEL +$1,400NOT SURE — CREW ADVISES
← BACK
ANSWER TO CONTINUENEXT — PROPERTY →
LIVE ESTIMATE
$2,800–$25,900
BATHROOM · GOOD
ACCURACY±16%
Every answer tightens the range. Step 7 turns it into a real menu of prices.
No markup. Crews get the rate card, you see the same numbers.

Verified crews, real jobs

Before: dated bathroom prior to renovation, Toronto
BEFORE — ORIGINAL CONDO BATH
After: completed bathroom renovation by Mr.Contractor, Toronto
AFTER — SAME ROOM, BETTER TIER

How the price gets — and stays — honest

  1. 01Build a 2-minute briefAnswer what you know, skip what you don’t. The estimate reprices live with every answer.
  2. 02Lock it with 10%Refundable until the first crew accepts. Verified crews take your job cards within 24–48h.
  3. 03One site checkHidden conditions only — photographed and priced in writing before anything proceeds.
  4. 04Pay per passed milestoneCrews are paid when milestones pass YOUR approval. Final 5% after your walkthrough.
Mr.Contractor site check — verifying measurements with the homeowner before the price locks

Bathroom renovation cost questions, answered straight

How much does a bathroom renovation cost in Markham in 2026?

On our rate card — the same for every customer — a full bathroom renovation in Markham runs $3,360–$29,150 depending on size, scope and spec. A powder room prices $0 below the full-bath number; a master ensuite runs +$0 for the extra footprint and fixtures. You can see your exact number in 2 minutes — no email, no sales visit.

What does the price include?

Demolition, disposal, plumbing and electrical work by licensed trades, waterproofing, tile, fixtures installation and paint — performed under your direct contract with the crew, with per-milestone payments released on your approval and a written change-order rule: no surprise costs, ever. Fixtures and tile are supplied at the tier you pick (Good/Better/Best), each priced on the page.

How long does a bathroom renovation take?

A standard full-gut bathroom takes 2–3 weeks on site. Powder rooms run about a week; ensuites with layout changes run 3–4 weeks. Crews start as soon as 2–3 weeks from deposit.

Do I need a permit for a bathroom renovation in Markham?

Like-for-like renovations (same layout, no structural or major plumbing moves) typically don't need a permit. Moving walls or relocating the stack does. Your crew handles permit questions at the site check — before your price locks.

Why is your price lower than the quotes I got?

It isn't padded, it's structured: your contract and price are direct with the crew, who gets the full rate-card labour price and pays the platform a partner fee — you never pay a markup on top. And because the price comes from a set rate card — the same for every customer — nobody is guessing at what you'll accept.

What if you find problems behind the walls?

Hidden conditions (rot, knob-and-tube, galvanized plumbing) are photographed, priced in writing, and approved by YOU before anything proceeds. The range you see already carries an allowance for the common ones in older Toronto homes.

Bathroom renovation across the GTA

TORONTONORTH YORKSCARBOROUGHETOBICOKEEAST YORKRICHMOND HILLVAUGHANMISSISSAUGAAURORA

More work in Markham

KITCHEN RENOVATIONBASEMENT FINISHINGFLOORING INSTALLATIONINTERIOR PAINTINGDRYWALL INSTALLATIONEXTERIOR PAINTING

Other 2026 cost guides

KITCHEN RENOVATION COST →BASEMENT FINISHING COST →FLOORING INSTALLATION COST →INTERIOR PAINTING COST →DRYWALL INSTALLATION COST →EXTERIOR PAINTING COST →

Your Markham number is on this page.

BUILD MY BATHROOM BRIEF ↑