MR.CONTRACTORSIGN IN

Kitchen renovation cost in Toronto (2026)

A cabinet reface (keep the boxes) in Toronto starts around $21,850; a full cabinet replacement runs about $26,780 at builder grade — and every pick reprices live as you build the brief. And unlike every cost guide on this page of Google, these numbers aren't estimates from last year: they render from the same live Mr.C rate card the crews are paid on, today.

SEE MY EXACT PRICE — 2 MIN ↓NO EMAIL · NO SALES VISIT
Finished kitchen renovation in Toronto — two-tone cabinets, quartz counters, gas range

What it actually costs in Toronto

STARTING PRICE BY ROOM · LIVE FROM THE MR.C RATE CARD — UPDATED AUGUST 2026
KEEP — REFACE · 24 LN FT
FROM$21,850
Keep the boxes — new doors & counters
REPLACE · 24 LN FT
FROM$26,780
Full tear-out, new cabinets

Those are builder-grade starting points — Better and premium tiers price up from there as you pick materials in the brief. Your number moves with square footage and the answers you give — smaller rooms genuinely price smaller, and every add or reduction shows as its own line. The estimate is ±30% at step one and ±8% by the end, then one site check locks it. After that, changes only happen as written change orders you approve.

RENOVATING IN TORONTOToronto's older stock — Victorian and Edwardian rows, wartime semis — hides the classics behind the walls: knob-and-tube, galvanized supply lines, plaster over lath. The range carries a hidden-condition allowance for exactly that, and the crew's one site check prices anything found in writing before work starts.

What moves the price

THIS IS THE LIVE BRIEF — TAP ANSWERS, WATCH YOUR ESTIMATE MOVE
STEP 3 OF 7 — DETAILS
The details
KITCHENANSWERS MOVE THE ESTIMATE LIVE
COUNTER RUNLN FT
rough is fine — the site check confirms it before your price locks
Cabinets?
Keep — refaceReplace
Layout / gas changes?
NoneMove appliances
Countertop material?
LaminateGraniteQuartzMarble / premium stone
Island?
No islandAdd an islandLarge island — seating + waterfall
BOOSTERS — OPTIONAL
UNDER-CABINET LIGHTING +$900POT FILLER +$1,200APPLIANCE INSTALL +$600
← BACK
ANSWER TO CONTINUENEXT — PROPERTY →
LIVE ESTIMATE
$21,900–$47,600
KITCHEN · GOOD
ACCURACY±16%
Every answer tightens the range. Step 7 turns it into a real menu of prices.
No markup. Crews get the rate card, you see the same numbers.

Verified crews, real jobs

Mr.Contractor crew installing kitchen cabinets in a Toronto home
ON SITE — MID-BUILD
Completed kitchen with white oak lowers and quartz countertops, Toronto
HANDED OVER

How the price gets — and stays — honest

  1. 01Build a 2-minute briefAnswer what you know, skip what you don’t. The estimate reprices live with every answer.
  2. 02Lock it with 10%Refundable until the first crew accepts. Verified crews take your job cards within 24–48h.
  3. 03One site checkHidden conditions only — photographed and priced in writing before anything proceeds.
  4. 04Pay per passed milestoneCrews are paid when milestones pass YOUR approval. Final 5% after your walkthrough.
Mr.Contractor site check — verifying measurements with the homeowner before the price locks

Kitchen renovation cost questions, answered straight

How much does a kitchen renovation cost in Toronto in 2026?

On our rate card, a kitchen renovation runs $21,850–$52,430 depending on footprint, cabinet count and spec tier. Cabinet-and-counter refreshes land at the low end; full-gut kitchens with layout changes at the top. Your exact number takes 2 minutes on the brief.

What's included in the price?

Demo and disposal, cabinet installation, counters, backsplash tile, plumbing and electrical by licensed trades, lighting, paint, and project management with per-milestone payments. Cabinets and counters follow your Good/Better/Best pick — each tier priced on the page.

How long does a kitchen renovation take?

A cabinet-and-counter refresh runs 1–2 weeks. A full kitchen with new layout runs 3–5 weeks including counter templating. The schedule is milestone-tracked in your project room with weekly photo updates.

Can I keep my existing layout to save money?

Yes — keeping appliances and gas where they are is a real saver: moving them adds +$3,000 on the card, and a full layout change adds more. The brief asks exactly that question and reprices live when you answer.

Are cabinets included?

Yes — supplied by the crew at the tier you pick, builder-grade shaker at STD through custom-fit at BEST, or they install yours if you already ordered. Both paths are on the rate card.

Kitchen renovation across the GTA

NORTH YORKSCARBOROUGHETOBICOKEEAST YORKMARKHAMRICHMOND HILLVAUGHANMISSISSAUGAAURORA

More work in Toronto

BATHROOM RENOVATIONBASEMENT FINISHINGFLOORING INSTALLATIONINTERIOR PAINTINGDRYWALL INSTALLATIONEXTERIOR PAINTING

Other 2026 cost guides

BATHROOM RENOVATION COST →BASEMENT FINISHING COST →FLOORING INSTALLATION COST →INTERIOR PAINTING COST →DRYWALL INSTALLATION COST →EXTERIOR PAINTING COST →

Your Toronto number is on this page.

BUILD MY KITCHEN BRIEF ↑